 |
Clients |
|
 |
Project Description |
|
 |
Cooling Capacity (kWR) |
|
 |
Air Flowrate |
|
 |
Year |
|
Petronas Carigali |
BAJTH |
15.24 |
1200 CFM |
2007 |
Carigali - Hess |
CHOC (BMA, BLA, SYA) |
3.85 |
393 CFM |
2007 |
Sarawak Shell |
SCDR-A |
53 |
2520 l/s |
2007 |
|
2.5 |
186 l/s |
Brunei Shell |
CER |
|
|
2007 |
MMDP1 |
60.2 |
2512 l/s |
MGCP1 |
45.9 |
2259 l/s |
MGCP1-GSR |
17.6 |
616 l/s |
Talisman /
Repsol |
BUNGA ORKID-A (BOA) |
|
|
2007 |
System 1 |
200.5 |
13316 l/s |
System 2 |
131.1 |
4624 l/s |
System 3 |
161.9 |
5337 l/s |
System 4 |
171.6 |
5251 l/s |
Petronas Carigali |
ABU CLUSTER |
77.43 |
11834 CMH |
2006 |
|
17.99 |
1973 CMH |
Sarawak Shell |
F13E(SC)DR-A |
54 |
2520 l/s |
2006 |
|
2.3 |
186 l/s |
Newfield |
EAST BELUMUT |
|
|
2007 |
System 1 |
164.3 |
4663 l/s |
System 2 |
184 |
6140 l/s |
Sarawak Shell |
F6 REJUVENATION |
|
|
2006 |
F6-PA |
98.3 |
19037 CMH |
F6-QA |
148.5 |
23998 CMH |
Petronas Carigali |
SUPG-B PHASE 2 M5 |
25.09 |
5713 CMH |
2006 |
Petronas Carigali |
SUPG-B M1 |
|
|
2007 |
System 1 |
160.3 |
11687 l/s |
System 2 |
109.5 |
4442 l/s |
MDFT |
KIKEH LER |
183.9 |
23292 CFM |
2006 |
|
17.8 |
670 CFM |
Murphy |
KIKEH DTU |
|
7800 l/s |
2006 |
ExxonMobil |
GUNTUNG E |
|
|
2004 |
Module 1 (Interm. Deck) |
329 |
49620 CMH |
Module 1 (Prod. Deck) |
221 |
36936 CMH |
Module 4 |
39 |
6490 CMH |
Module 5 |
50 |
8256 CMH |
Module 6 |
41 |
6832 CMH |
Sarawak Shell |
F6QA-LQ |
|
|
2008 |
System 1 |
168.6 |
4286 l/s |
System 2 |
200.7 |
5306 l/s |
Sarawak Shell |
F23QA-LQ |
|
|
2007 |
System 1 |
156.5 |
4000 l/s |
System 2 |
200.7 |
5306 l/s |
Cpoc |
JDA BLOCK B17 |
258.9 |
11055 l/s |
2008 |
Petronas Carigali |
BARAM M1 |
61.1 |
3771 CMH |
2005 |
Petronas Carigali |
BARAM M3 |
|
|
2005 |
System 1 |
143 |
36300 CMH |
System 2 |
44 |
5359 CMH |
Sarawak Shell |
E11 P-B |
177 |
20345 CFM |
2005 |
Sarawak Shell |
B11 Redevelopment |
189 |
11911 l/s |
2009 |
Petronas Carigali |
Dulang- B |
33.8 |
1920 l/s |
2008 |
Brunei Shell |
Bugan |
57.8 |
3039 l/s |
2008 |
Murphy |
GO-PA & PB |
23.9 |
4644 CMH |
2008 |
Petronas Carigali |
J4 |
7 |
|
2008 |
PC Vietnam |
PLDP-A (Pearl) |
2.7 |
1200 CMH |
2008 |
Sarawak Shell |
SJK-A |
52.2 |
3897 l/s |
2008 |
|
60.25 |
2740 l/s |
Sarawak Shell |
F23 VLAP COMPRESSION PROJECT |
185.3 |
6861 l/s |
2009 |
Sarawak Shell |
F23R-A (RAMUNIA) |
226 |
11635 l/s |
2009 |
MISC |
GUMUSUT HULL E&I (SPLIT UNIT) |
30000 BTU/HR |
462 l/s |
2009 |
Sarawak Shell |
GUMUSUT TOPSIDE |
|
|
2009 |
Sarawak Shell |
KNDP-A SFDP-A BTMP-B |
137 |
5700 l/s |
2009 |
|
68 |
2790 l/s |
|
38 |
1075 l/s |
Petronas Carigali |
KNJT-C |
11 |
779 l/s |
2009 |
Murphy |
SEPA |
40.1 |
2534 l/s |
2009 |
Sarawak Shell |
ST.JOSEPH |
444 |
16883 l/s |
2009 |
Petronas Carigali |
TANGGA BARAT |
|
|
2009 |
System 1 |
103 |
4537 l/s |
System 2 |
84 |
4234 l/s |
System 3 |
76 |
5422 l/s |
System 4 |
82 |
3450 l/s |
System 5 |
97 |
4164 l/s |
System 6 |
110 |
9771 l/s |
System 7 |
190 |
8810 l/s |
System 8 |
23.8 |
1196 l/s |
System 9 |
23.8 |
1196 l/s |
System 10 |
10 |
518 l/s |
Petronas Carigali |
KNPG-B |
|
|
2010 |
System 1 |
160.8 |
5830 l/s |
System 2 |
71.4 |
3293 l/s |
System 3 |
108.5 |
3782 l/s |
System 4 |
76.6 |
2620 l/s |
System 5 |
80.5 |
2972 l/s |
System 6 |
114.1 |
7424 l/s |
System 7 |
241.6 |
12500 l/s |
Coruweld Engineering Services |
OKHA FPSO |
48 |
1340 l/s |
2010 |
Petronas Carigali |
ANGSI-B |
23.8 |
1600 l/s |
2011 |
Petronas Carigali |
BERANTAI |
25.4 |
1100 l/s |
2011 |
Sarawak Shell |
F6Q-A |
|
|
2011 |
Murphy |
MEPA |
41.3 |
2595 l/s |
2011 |
ExxonMobil |
TAPIS Q |
42.3 |
1428 l/s |
2011 |
ExxonMobil |
TAPIS R |
|
|
2011 |
System 1 |
182.5 |
4799 l/s |
System 2 |
169.4 |
6839 l/s |
System3 |
473.7 |
28170 l/s |
System4 |
21.8 |
1492 l/s |
Petronas Carigali |
BEKOK C |
|
|
2012 |
System 1 |
13.8 |
830 l/s |
System 2 |
62.6 |
3793 l/s |
KPOC |
KPOC SDE |
183 |
11270 l/s |
2012 |
Petrofac |
LER SKID (CDW-B & CDW-C) |
|
|
2012 |
Murphy |
SA-AA |
66.7 |
6861 l/s |
2012 |
Murphy |
SA-PA |
197.1 |
12700 l/s |
2012 |
|
SOUTH ACIS |
|
|
2012 |
ExxonMobil |
TELOK A |
47.1 |
1900 l/s |
2012 |
ExxonMobil |
TELOK B |
47.1 |
1936 l/s |
2012 |
PC Myammar |
YETAGUN |
40 |
1954 l/s |
2012 |
Brunei Shell |
B23 |
|
|
2013 |
ExxonMobil |
DAMAR-A |
48.4 |
1936 l/s |
2013 |
Murphy |
PERMAS - MURPHY |
132.8 |
6738 l/s |
2013 |
Total |
AMP-2 Platform |
|
|
2005 |
Talisman /
Repsol |
BUNGA RAYA E |
|
|
2005 |
Brunei Shell |
Champion |
65 |
2691 l/s |
2004 |
Sarawak Shell |
E8DR-A Drilling Riser Platform |
10.3 |
840 CFM |
2005 |
OXY |
SMOE OXY |
180 |
9377 l/s |
2005 |
Talisman /
Repsol |
SOUTH ANGSI A |
205 |
10038 l/s |
2004 |
Petronas Carigali |
WEST NATUNA |
37.6 |
3632 CFM |
2004 |
Murphy |
West Patricia |
|
|
|
Saipem |
YOHO |
60.7 |
2031 l/s |
2003 |
|
FPSO |
|
5777 CFM |
2003 |
Brunei Shell |
EGRET |
|
|
2003 |
Chevron |
wheatstone |
|
|
2012 |
Murphy |
BELUM-BPS |
59.5 |
2480 l/s |
2014 |
Lundin Malaysia |
BERTAM THE |
168.8 |
7833 l/s |
2014 |
Petronas Carigali |
SK316-CPP |
357.3 |
21102 l/s |
2014 |
SK316-DP |
47.3 |
2936 l/s |
2014 |
Carigali Hess |
Bergading |
|
|
2014 |
Petronas Carigali |
Duyong - LQS CPP GCP |
|
|
2014 |
Petronas Carigali |
ANGSI COMPRESSION MODULE |
43.8 |
1874 l/s |
2015 |
Petronas Carigali |
BESAR-A (BsDP-A) |
181.7 |
6272 l/s |
2015 |
Anjur Ekar |
ANJUR EKAR |
|
|
2016 |
Petronas Carigali |
F12JT-A |
|
|
2016 |
Petronas Carigali |
Bekok A |
11.1 |
405 l/s |
2016 |
Pertonas Chemical |
PCSB - AH1 |
24.4 |
413 l/s |
2016 |
JVPC |
JPVC (RANG DONG) PROJECT |
34 |
690 l/s |
2015 |
OXY |
Oxy Lab |
|
|
2015 |
ExxonMobil |
Tapis B |
71.1 |
3133 l/s |
2015 |
Petronas Carigali |
Tukau Timur (TTJT-A) |
27.5 |
1431 l/s |
2015 |
Petronas Gas |
GPK |
|
|
2015 |
Murphy |
SA SA |
8.83 |
415 l/s |
2015 |
Sarawak Shell |
E11LQ - Living Quarters |
|
|
2004 |
System 1 |
155 |
8548 CFM |
System 2 |
244 |
20552 CFM |
Sarawak Shell |
E11k-a |
|
|
2004 |
Sapura Kencana Energy |
B15 SK 310 |
|
|
2015 |
Living Quarters |
95.3 |
3207 l/s |
Control Building |
|
|
Petronas Carigali |
Baronia (BNJT-K) |
63.1 |
2332 l/s |
2016 |
DNB Petroleum |
BRD Portable Lab (DNB) |
6.45 |
|
2016 |
Talisman /
Repsol |
Kinabalu Re-Dev (KNDW-D) |
33 |
1378 l/s |
2016 |
Petronas |
Rapid P016B |
|
|
2016 |
Petronas |
Rapid Package 1- Yokogawa |
|
|
2016 |
Petronas |
Rapid Package 3- Yokogawa |
|
|
2016 |
Petronas |
Rapid Package 3-Tecnicas Reunidas |
|
|
2016 |
Sarawak Shell |
BARTON (BTMP-B) HVAC UPGRADING PROJECT |
|
|
2010 |
Sarawak Shell |
SOUTH FURIOUS (SFDP-A) HVAC UPGRADING PROJECT |
|
|
2010 |
Sarawak Shell |
B11P-A |
|
|
2002 |
CNR International |
MODEC |
|
|
2004 |
Kencana HL |
HVAC Works for BNJT-K |
65.9 |
|
2017 |
Malaysia Marine Heavy Engineering |
HVAC Works for F12 |
27 |
|
2017 |
Ocean Might |
HVAC Works for KND |
31.9 |
|
2017 |
Water Engineering Technology |
RAPID:Package 16B |
- |
|
2017 |
Sapura Kencana Petroleum |
HVAC Works for SKE-310 B15 Development Project |
88.7 |
|
2017 |
Tecnicas Reunidas Malaysia |
RAPID:Package 3 |
- |
|
2017 |
Brooke Dockyard Engineering & Corporation |
E6DP-A |
12.2 |
|
2017 |
Petronas Carigali |
Baronia-B Complex |
34.1-256.7 |
|
2019 |
Brooke Dockyard Engineering & Corporation |
ANJUNG |
6.6 |
|
2018 |
PRPC Refinary & Cracker Sdn Bhd |
HVAC Works for P28B |
167.4 |
|
2019 |
|
HVAC Works for FAR144 |
167.4 |
|
2019 |
Petronas Carigali Sdn Bhd |
BOKOR |
450-550 |
|
2019 |
FPSO Ventures Sdn Bhd
|
Provision of Parts & Maintenance
|
- |
|
2021 |
Mubadala Petroleum |
PEGAGA |
363.7 |
|
2020 |
Petronas Carigali Myanmar |
EPCIC of Acid Gas Removal Unit (AGRU) |
26.0 |
|
2020 |
Mubadala Petroleum |
PEGAGA LQ
|
531.4 |
|
2020 |
IDEMITSU |
DN-WHP |
69.3 |
|
2020 |
Brunei Shell |
EPCI BSP SALMAN |
12.5 |
|
2021 |
Petronas Carigali |
KASAWARI (KSDP) |
41.2 |
|
2021 |
Petronas Carigali |
KASAWARI (CPP) |
462.2-508.2 |
|
2021 |
Petronas Gas Berhad |
GPP4 (FPB4) |
138.0 |
|
2022 |
PTTEP Sarawak Oil Limited |
Provision of Parts & Maintenance |
- |
|
2024 |
Petronas Carigali |
EPCIC JERUN DEV |
165.4-251.8 |
|
2024 |
Petronas Rapid |
EPCIC For Installation of 9 NosFilter Coalescer |
- |
|
2022 |